As usual, Doug Cooke defends ESAS:
The “direct” variation fails to meet NASA’s needs on several grounds. It is vastly over-capacity and too costly to service the International Space Station, but worse, its lift capacity would not be enough for NASA to maintain a sustained presence on the moon.
Advocates for the “direct” variation are touting unrealistic development costs and schedules. A fundamental difference is that the Ares I and Orion probability of crew survival is at least two times better than all of the other concepts evaluated, including “direct”-like concepts.
Also as usual, he provides no evidence for his assertions. We are simply supposed to accept them because Doug Cooke says so. Have we ever seen the actual report that came out of the sixty-day study, with a description of methodology and assumptions? I haven’t.
I’m not necessarily a big fan of “Direct,” but his statement raises more issues than it answers. Why doesn’t the “lift capacity allow a sustained presence on the moon” in a way that ESAS does? Why should it be assumed that NASA’s new launch system will service space station? I thought that this was what COTS was for? What are the marginal costs of an additional Jupiter launch versus Ares 1?
Give us some numbers, and provide a basis for them, and we might take this seriously.
[Wednesday morning update]
More thoughts and comments at NASA Watch, and from Chair Force Engineer.